Case 1: Project name: paper constant temperature and humidity room The construction unit: a entry and exit inspection and quarantine Project content: the constant temperature and humidity lab engineering and laboratory equipment other form a complete set, the overall construction. Engineering status: laboratory, a total area of about 86 m2 for. The height is 2.6 meters, the temperature and degree is obtai ℃, humidity 50-2% RH. Laboratory layout:
Case 2: The construction unit: a enterprise textiles testing laboratory Project content: the constant temperature and humidity lab engineering and laboratory equipment other form a complete set, the overall construction. Engineering status: laboratory, a total area of about 50 m2, the layer is 2.6 meters, the temperature is 20 degree is obtai ℃, humidity 65 + 2% RH. Laboratory layout:
|