Project name: comprehensive laboratory The construction unit: national textile quality test center Project content: lab decoration engineering, electrical engineering, low intelligence engineering, water supply and drainage engineering, ventilation system, laboratory furniture, constant temperature and humidity systems, gas pipeline, etc Engineering status: total area of about 2570 m2 of laboratory, layer is 2.7, the temperature is 20 degree is obtai, humidity 65 + 2% RH. Laboratory layout:
|